Yard schematic — Newton Heath TMD
Drag units between roads. Tap a unit to couple/uncouple formations. Coupled formations move together and moves are validated.
Unit statesAvailableAllocated / In serviceCleanedIn PrepOn maintenanceFault / DefectStoredRoad blocked
Reception & Servicing
6 roadsNo.3 Holding SidingPts 34
0/246m
Clear — 246m available
Fueling ApronPts 33/35
46/140m
Wash Road APts 36
40/120m
Wash Road BPts 37
40/120m
No.1 IntakePts 16
40/118m
No.2 IntakePts 17
0/125m
Clear — 125m available
Carriage Cleaning
4 roadsNo.1 CarriagePts 20
115/220m
No.2 CarriagePts 21
40/220m
No.3 CarriagePts 22
40/190m
No.4 CarriagePts 23
0/190m
Clear — 190m available
Stabling / Holding
5 roadsNo.1 HoldingPts 26
40/110m
No.2 HoldingPts 27
138/160m
No.3 HoldingPts 28
40/110m
No.4 HoldingPts 29
0/80m
Clear — 80m available
No.17 Stores RoadPts 30
40/90m
195 Shed
4 roads195 No.1 RoadCoveredPts 4
115/125m
195 No.2 RoadCoveredPts 5
69/125m
195 No.3 RoadCoveredPts 6
46/125m
195 No.4 / JackingCoveredPts 7
69/125m
Maintenance Shed
4 roadsMtc No.1 RoadCoveredPts 45
40/125m
Mtc No.2 RoadCoveredPts 46
40/125m
Mtc No.3 RoadCoveredPts 47
40/125m
Wheel Lathe (UFC)CoveredPts 48
40/90m
South Holding
4 roadsNo.9 HoldingPts 40
40/116m
No.10 HoldingPts 41
46/78m
No.11 HoldingPts 42
40/72m
No.13 HoldingPts 43
40/136m